Building BIM Confidence: How ATG Fast-Tracked JB Henderson’s Revit & Navisworks Success

Faced with the challenge of training both new and existing staff on BIM technologies, JB Henderson turned to ATG for instructor-led guidance and process optimization. Discover how customized training, model health best practices, and collaborative workflows helped the team exceed expectations and finish ahead of schedule.
Learning to Leading: How ATG Helped LGE Design Build Take Ownership of TradeTapp

When LGE Design Build needed to confidently manage vendor prequalification and subcontractor approvals in-house, ATG provided hands-on TradeTapp training that accelerated adoption and empowered the team to make the platform part of their daily operations. Read the story to see how the engagement not only drove immediate success but also uncovered new opportunities to support LGE’s future growth.
A Better BIM Experience: How ATG Earned Hawkeye Electric’s Trust

When past coordination challenges threatened project efficiency, Hawkeye Electric looked for a partner closer to home who could truly act as an extension of their team. Learn how ATG delivered seamless electrical coordination on a major Intel project and earned a reputation as a trusted partner for future growth.
How ATG’s Expert Guidance Led to TradeTapp Expertise for the CSM Group

A need for TradeTapp training turned into a successful partnership that empowered CSM Group’s entire preconstruction team. Discover how ATG’s hands-on guidance and lasting training resources helped the team build confidence, improve platform adoption, and support future growth.
How Proactive BIM Support from an ATG Expert Helped Enterprise Electrical Stay Ahead

When coordination delays from other trades threatened to slow progress on the Norwalk Hospital Behavioral Health Unit project, Enterprise Electrical Contractors turned to ATG for expert BIM support. Discover how Jared’s proactive communication and coordination expertise helped the team complete their scope ahead of schedule, allowing them to move on while other trades were still working through coordination challenges.
Empowering Teams Through Training: Kemper Industrial’s Autodesk Build Transformation

4m Design Group struggled with the inefficiencies of hand-measuring sites for their historic preservation projects. Read how ATG helped get their projects on the right track.
Locked Out & Losing Time: How ATG Solved a Critical Autodesk Access Issue for Polk Stanley Wilcox Architects

4m Design Group struggled with the inefficiencies of hand-measuring sites for their historic preservation projects. Read how ATG helped get their projects on the right track.
Beyond the Documentation: How ATG Saved PCI Ecological Time & Prevented Production Loss

4m Design Group struggled with the inefficiencies of hand-measuring sites for their historic preservation projects. Read how ATG helped get their projects on the right track.
Eliminating Manual Measurements & Delivering Quality Drawings for 4m Design Group

4m Design Group struggled with the inefficiencies of hand-measuring sites for their historic preservation projects. Read how ATG helped get their projects on the right track.
Scaling Smarter: How ATG Helped Rex Moore Electrical Expand Their BIM/VDC Without Missing a Beat

Find out how ATG provided scalable & valuable BIM/VDC support that integrated seamlessly with Rex Moore Electrical’s team and standards.