From 20 Hours to 52 Minutes: How BIMBOX Transformed BNBuilders’ Point Cloud Performance

The Challenge BNBuilders’ Innovation, Geomatics, and Survey teams faced significant bottlenecks when processing scan data for major projects. Their existing enterprise-grade Dell Precision laptops were taking between 4.5 and 20 hours to import large point clouds. Project Goals The team aimed to drastically reduce point cloud import times and eliminate long wait periods. Additionally, they […]

ENFRA – Creating a Scalable Foundation for Future Enhancements

The Challenge ENFRA needed to retire a solution with outdated branding. In place of that solution, they asked for an ENFRA-branded Revit plugin that would consolidate updates of the existing tools for newer Revit versions.  They also needed to dramatically reduce their manual cleanup efforts by introducing a new high-impact tool called Keep. Project Goals […]

Forcum Lannom Contractors – Reducing Their Downtime with BIMBOX Slim Pro Machines

The Challenge Forcum Lannom Contractors struggled with aging Dell workstations that were unable to keep up with modern workflow demands. Their hardware frequently lagged, resulting in the “spinning wheel of death” and significant downtime. Project Goals The primary objective was to acquire high-performance machines that could match the speed of their team. They specifically needed […]

RIS Electric – How ATG Helped Launch Their Internal BIM Department

The Challenge RIS Electric wanted to establish an internal BIM department but faced a significant hurdle: their designated lead, Project Manager Blake Hunter, had very little experience with Revit or other drafting programs. They needed a partner to provide the foundational training necessary to turn a novice user into a department head. Project Goals The […]